Volos Ident

Size

2km Cycleway

Value

£6.4m

Scheme Overview

The development of a new 2km dual cycleway with sustainable urban drainage (SUDS) features.

The project provides improved active travel connectivity for the city with the new cycleway traveling through the heart of Cardiff to link the city centre with the University of Wales Hospital.

The project involved improved footways and pedestrian crossings; build-outs and tabled junctions; new parking layouts for residents, resurfacing the entire road and footway along the route. SUDS features included rain gardens and tree pits for flood prevention and to provide a sustainable drainage system.

How the project was delivered

Our engineers and quantity surveyors provided a wide range of services including detailed design and construction design support, along with the procurement processes of the project.

Our quantity surveying team undertook the role project quantity surveyor during the construction phase of the project.